RE-BUILDING TIMELINE 2001-2004 Also see Building - Old and New
3rd December 2004 The church’s Christmas Tree is unveiled. Based in a wrought metal tree, unique leaves have been drawn by members of the congregation and printed onto thin aluminium by Laura Cave.
31st October 2004 The church holds a reunion event for 200 present and former members of the church, with attendance dating back to 1925.
3rd October 2004 Regular Sunday meetings begin.
26th September The rededication of the church takes place with 120 visitors from the Salt and Light UK network of churches, and local TFG churches.
19 September 2004 First Sunday meeting in the new building.
9 September 2004 The congregation holds its first small group meeting in the church
27 August 2004 The church was handed over to the developer after carnival weekend in 2001. Today, almost 3 years to the day, the church received back the keys to the church from the developer.
15 July 2004 New furniture is being commissioned including a communion table and lectern by designers Luke Hughes.
21 June 2004 Laying of the oak floor in the main hall begins.
17 June 2004 The Westbourne Grove Church aluminium nameplate appears in the front door.
11 June 2004 Laying of the stone floor in the new lobby has begun. The stone is a grey limestone giving a hardwearing surface with indefinite life.
11 June 2004 The sanctuary walls and ceiling are nearing completion. The sanctuary has been acoustically isolated from the rest of the building, protecting both the apartments above and the neighboring buildings from noise pollution. The room will also be acoustically balanced to give auditorium grade sound.
8 May 2004 250 chairs are ordered to a 40 year old classic design, the “40/4” David Rowland chair manufactured by Howe. This widely used and respected chair design has been in use at St Pauls Cathedral for 30 years, aas well as the National Gallery, Tate Gallery, British Library, Royal Opera House, Bauhaus, GLA building, Reichstag etc etc.
March 2004 Roof structures are completed and windows fitted. Internal works, wiring and other services, are underway.
November 2003 Spires return to Westbourne Grove Church after 50 years absence.
October 2003 Exterior walls are reconstructed.
September 2003 Basement and ground floor reinforced concrete slabs completed and steel frame of upper floor is fully assembled.
March 2003 Reconstruction resumes.
Summer 2002 East wall taken down and stored for later rebuilding.
Feb 2002 Collapse of the Ledbury Road wall.
September 2001 Building handed over to Manhattan Loft for redevelopment.
|